Risk Assessments and Method Statements: What Good Looks Like
Risk assessments and method statements (RAMS) are among the most requested documents in construction. Done well, they keep people safe. Done badly, they are a pile of generic paper that nobody reads.
Risk Assessment: Five Steps
- Identify the hazards on this site and for this task
- Decide who might be harmed and how, including the public and other trades
- Evaluate the risks and decide on controls: eliminate first, then reduce, isolate and control, with PPE as the last resort
- Record the findings (a legal requirement if you employ five or more people) and brief the team
- Review when conditions change, after an incident and at regular intervals
A Method Statement Should Include
- The task, location and who will carry it out, with their competence
- Plant, equipment, materials and substances
- A clear sequence of operations, step by step
- The hazards and controls, referring to the risk assessment
- Welfare, emergency and rescue arrangements
- Permits, exclusion zones, traffic and public protection
Make Them Work on Site
- Write them for the task, not for every job you ever do
- Brief everyone who will do the work and have them sign
- Check that the work follows the method, and stop and re-brief if conditions change
- Keep them with the site records
Be wary of a RAMS pack that is meant to cover every situation. A principal contractor or inspector will expect site-specific detail.
These guides are general information, not legal advice. Check the current legislation and regulator guidance for your own situation.
Guidance based on published standards. Not legal advice or official certification. Our articles are general guidance, not advice on your own circumstances.