Do You Need a Construction Phase Plan for a Small Job?

5 November 2026 · 6 min read · Construction

By Edward Nabulele, ICO Data Protection Essentials Certified
  • #CDM2015
  • #Constructionphaseplan
  • #Smallcontractors
  • #Construction
  • #Healthandsafety

Yes, in almost every case. HSE says CDM 2015 applies to all construction work, including domestic projects, and a general builder needs a construction phase plan for the work they do. If you are the only contractor, you prepare the plan, or arrange for it, before you set up the site. If there is a principal contractor, they prepare it.

The plan does not have to be long. HSE says it should be proportionate to the size and scale of the job, and that a simple plan before the work starts is usually enough to show that you have thought about health and safety.

This guide covers who prepares the plan, what it must contain, a practical layout for a small job, and how the plan differs from notifying HSE. It is general guidance based on published sources, written for work in Great Britain.

Who Prepares the Plan

  • You are the only contractor. You prepare the plan, or arrange for someone else to prepare it, as soon as practicable before the site is set up (regulation 15 of CDM 2015).
  • There is a principal contractor. On projects with more than one contractor, the principal contractor prepares the plan (regulation 12). If you work for them, you give them the information they ask for and follow the plan.
  • The client's part. The client must ensure that a construction phase plan is prepared before the construction work starts (regulation 4).
  • Domestic clients. HSE says that on domestic projects you will usually be solely responsible for site health and safety. Treat the plan as yours to prepare unless a principal contractor has been appointed.

What the Plan Must Cover

The regulations set a minimum. The plan must set out the health and safety arrangements and the site rules for the period the work is carried out, taking account of any industrial activities on site (regulation 12). It must also include specific measures for any work in the categories listed in Schedule 3 to the regulations. The same requirement applies to a single contractor through regulation 15.

Schedule 3 covers higher-risk work, including:

  • work with a risk of burial or falling from height that is made worse by the nature of the work or the site
  • work exposing people to hazardous chemical or biological substances
  • work near high-voltage power lines
  • work with a risk of drowning
  • work on wells, underground earthworks and tunnels
  • work involving explosives, ionising radiation, diving or compressed-air caissons
  • assembling or dismantling heavy prefabricated components

Most small jobs will not involve most of these. If yours does, the plan needs specific measures for that work.

A Practical Layout for a Small Job

The law sets the minimum, not the format. This layout follows what the regulations require and HSE's advice to keep the plan proportionate, and it works for many small jobs. HSE's CIS80 guidance includes a template, which is a good place to start.

  1. The job. Address, client, start and finish dates, and a short description of the work.
  2. People and responsibility. Who is in charge on site, how to contact them, and who else is working there.
  3. Main risks and controls. The significant risks and how you will control them, with your risk assessments and method statements behind it.
  4. Site rules. Access, inductions, PPE, visitors, deliveries and working hours, and how you will work around other trades and the public.
  5. Welfare. Toilets, washing facilities, drinking water and somewhere to rest and eat.
  6. Emergencies. First aid, fire, the nearest hospital and how accidents are reported.
  7. Higher-risk work. Any Schedule 3 work and the specific measures for it.
  8. Review. How you will update the plan if the work or the site changes.

Keep It Under Review

On projects with a principal contractor, the regulations require the plan to be regularly reviewed, updated and revised so that it stays sufficient. Doing the same on a single-contractor job is sensible practice. If the scope changes, a new trade arrives or you find something unexpected, update the plan and tell the people it affects.

The Plan Is Not the Same as Notification

Notification is a separate duty. A project must be notified to HSE only if the work is expected to last longer than 30 working days and have more than 20 workers on site at the same time at any point, or to exceed 500 person days. HSE says every day on which construction work is likely to be carried out counts, including weekends and holidays. The client is responsible for notification, using HSE's F10 form.

Many small jobs fall below those thresholds. They still need a construction phase plan.

Common Mistakes

  • A generic plan. A plan that could belong to any job shows little thought. Use the real address, the real people and the real risks.
  • Forgetting welfare. It is easy to plan the work and not plan where people will wash or eat.
  • Treating the RAMS as the plan. Risk assessments and method statements cover individual tasks. The plan covers the arrangements for the whole job, with the RAMS behind it. Our guide to risk assessments and method statements explains what good ones look like.
  • Never updating it. A plan written before the job and never looked at again does not reflect what happens on site.

Questions People Ask

Do Domestic Jobs Need a Construction Phase Plan?

Yes. HSE says CDM 2015 applies to all construction work, including domestic projects.

Do I Send the Plan to HSE?

No. HSE asks the client to notify notifiable projects using the F10 form. The plan is kept by the people who prepare it and use it on the job.

Who Prepares the Plan If I Work for a Principal Contractor?

The principal contractor. HSE says that if you are a contractor working for a principal contractor, it is the principal contractor who must draw up the plan. You will still be asked for information and expected to follow it.

Is There a Template?

Yes. HSE publishes a template in its CIS80 guidance, and for small jobs it also points to a CITB app.

Where to Go Next

A plan usually points to other documents. The construction pack includes a CDM health and safety policy, a risk assessment policy, a method statement procedure, an emergency procedures plan and a first aid policy that a plan can refer to. They are starting points to adapt to your business, not finished answers. For a wider view of the regulations, read our plain-English guide to CDM 2015.

Guidance only. Not legal advice or regulator certification. Templates require qualified review before use.

Sources

Checked on 5 November 2026.

Guidance based on published standards. Not legal advice or official certification. Our articles are general guidance, not advice on your own circumstances.